Sign In | Join Free | My xpshou.com
China Beijing Zulin Formwork & Scaffolding Co., Ltd. logo
Beijing Zulin Formwork & Scaffolding Co., Ltd.
Beijing Zulin Formwork & Scaffolding Co., Ltd. ---Formwork and scaffolding solution
Verified Supplier

14 Years

Home > Self Climbing Formwork >

High Active Auto Self Climbing Formwork Hydraulic Synchronous ZPM-100

Beijing Zulin Formwork & Scaffolding Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

High Active Auto Self Climbing Formwork Hydraulic Synchronous ZPM-100

Model Number : ZPM-100

Place of Origin : Beijing, China (Mainland)

Brand Name : ZULIN

Certification : ISO9001-2008

Price : Negotiation

MOQ : One 20ft container

Delivery Time : After deposit 15-20 days

Payment Terms : T/T L/C (bank transfer)

Supply Ability : 100sets/day

Packaging Details : In bulk,pallet,bundle or according the customer demand

Contact Now

High Active Auto Self Climbing Formwork Hydraulic Synchronous ZPM-100

Introduction

The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes

the oilcylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole

formwork system climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the

best choice for construction of high buildings and towers.

ZPM-100 Structure Sketch

The Characteristics


1 The system is able to climb as a whole or individually, and in a stable way.
2 As the system climbs by itself and cleaning work is done in situ, tower crane lifts are greatly reduced.
3 It’s safe and convenient to operate, and labor and material costs will be greatly slashed.
4 The bracket will not come back to the ground until the construction is finished. Field spacing will be reduced and

the bumping damages can be almost prevented, especially for the panels.
5 The climbing process is steady, synchronous and safe.
6 All-purpose platforms are provided, and there is no need to set up additional operation platforms, which means

saving the labor and material costs again.
7 There is little margin for error. And if there is, it is simple and easy to correct. Deviations of construction work can

be eliminated floor by floor.
8 Fast climbing speed can be achieved, and the construction cycle will be maintained according to schedule.

Project Application

Project Name:Yongjiang Bridge (Ningbo,China)

Builder:CCCC.First Highway Engineering Bureau


Product Tags:

automatic climbing formwork

      

slip form formwork

      
China High Active Auto Self Climbing Formwork Hydraulic Synchronous ZPM-100 wholesale

High Active Auto Self Climbing Formwork Hydraulic Synchronous ZPM-100 Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Beijing Zulin Formwork & Scaffolding Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)